Kosciuszko Bridge & Under the K Park
Brooklyn, NY
Replacement of a 1.1-mile segment of the Brooklyn-Queens Expressway i-278 including a twin cable-stayed main span over Newtown Creek.
Budget $873M
Duration 3/2010 – 5/2022
Services Landscape Architecture, Engineering, Urban Design, Environmental Planning

Bronx River Greenway
Bronx, NY
-standard-scale-2_00x-gigapixel.jpg)
Transformational project connects communities and encompasses four bicycle/pedestrian bridges and a path along and over the once-neglected Bronx River.
Budget $80M
Duration 6/2016 – 5/2023
Services Landscape Architecture, Engineering, Urban Design, Architecture, Environmental Planning
FDR Drive – Sutton Place Park
New York, NY
A series of vest-pocket parks along the East River connected by
a restored public promenade on a revamped roof deck park over the
FDR Drive with expansive views of Queensboro Bridge.

Budget $180M
Duration 11/2011 – 9/2019
Services Landscape Architecture, Engineering, Urban Design, Architecture, Environmental Planning
Bloomfield Avenue Streetscape Revitalization Verona, NJ
Enhance the visual and functional quality of Bloomfield Avenue, making it safer, more attractive, and accessible for all users, along with utility upgrades and the redesign of the town center greenspace.
Budget $2.75M
Duration 7/2025 – ongoing
Services Landscape Architecture, Engineering, Urban Design, Environmental Planning

MASPETH PARK
QUEENS, NY
Enhance the Queens touch-down point of the Kosciuszko Bridge’s New Greenway link to Brooklyn
Budget $17.8 M
Duration 03/2021 – 10/2023
Services Landscape Architecture, Engineering, Urban Design

SWINDLERS COVE PARK
NEW YORK, NY
Redevelop Swindlers Cove into a resilient five-acre waterfront park along the Harlem River

Budget $28 M
Duration 03/1999 – 08/2003
Services Landscape Architecture, Engineering, Urban Design
1037 Raymond Blvd., 15 FL., Newark, NJ 07102
70 East Sunrise Hwy; Suite 500, Valley Stream, NY 11581
917-768-0003





























